Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring

Categories

Categories

Additional Information

Additional Information
  • Home

Account Navigation

Account Navigation

Currency - All prices are in AUD

Currency - All prices are in AUD
 Loading... Please wait...
  • Call us on 855-543-5159
  • My Account
  • My Cue
  • Gift Certificates
Stover's Liquidation

Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring Stovers-liquidation-wholesale-discount-closeout-resale-flooring

Categories

Categories

Blog

Happy Feet Quick Fit LVP Installation Guide

Posted by Happy Feet International on

QuickFit

Flooring type: 5mm Loose Lay with Beveled Edge

Residential Warranty: Lifetime Limited

Commercial Warranty: 20 Year Limited

Composition: 100% Virgin PVC Material / FiberglassLayer

Wear Layer: 22mil Total Wear Surface

Additional Benefits:

  • •UV Cured PolyurethaneFinish
  • •100%Waterproof
  • •Anti-Microbial
  • •Anti-Scratch
  • •Anti-Slip
  • •FloorScoreCertified

Measurement

Size: 9” x 48”

Carton Size: 8 pieces (24 sq. ft. per carton) Pallet Size: 60 cartons (1,440 sq. ft. per pallet)

Installation

DIY Level: Easy

Installation Method: Loose Lay

Midnight HF750

Caramel HF751

Foxwood HF752

Sawtooth Grey HF753

Ashwood HF754

Installation Guide Loose-Lay

Please follow these instructions for the best installation.

  • 1.The installation area must be climate controlled for at least one week before installation, during installation, and continuously after installation. Proper conditions are between 65 and 85 degrees F (18-29 C). This product is not suitable for installation in non-climate controlled areas such as covered decks, porches or outdoors.
  • 2.Acclimate the product to the climate-controlled location’s temperaturefor a minimum of 48 hours before starting installation. It is important that the flooring be the same temperature as the area it is installed in.
  • 3.Make sure the subfloor is clean and clear of all debris before installation.
  • 4.Pull planks from different cartons when installing to ensure apleasant blending of colors from possibly different production runs. Slight color variations are normal and expected between print runs.
  • 5.As much as possible protect the floor from long term direct exposure to sunlight.

Preparing the Subfloor

Subfloor preparation is very important for a successful installation. The better prepared the subfloor, the better looking the finished floor will be.

Roughness or unevenness of the subfloor may telegraph through the new floor. All subfloors should be smooth and flat with a tolerance of 1/8" in a 6 foot span (3mm over 1.8m) or less. All subfloor and underlayment patching must be done with a non-shrinking, water-resistant Portland cement type patching compound.

-- Concrete subfloors must be dry, smooth and free from dust, solvent, paint, wax, grease, oil, asphalt sealing compounds and other extraneous materials. The surface must be hard, dense, and free from powder or flaking. The floor should have a moisture reading of less than 75% RH.

-- New concrete slabs must be thoroughly dry, at least six weeks old, and completely cured. The final responsibility for determining if the concrete is dry enough for installation of the flooring lies with the floor covering installer.

-- Holes, grooves, expansion joints and other depressions must be filled with a Portland cement based underlayment and troweled smooth and feathered even with the surrounding surface. Irregularities will telegraph through the floor and be visible on the finished surface and are not covered by the warranty.

-- Concrete floors with a radiant heating system are allowed as long as the temperature of the subfloor does not exceed 80°F (27°C) at any point. The heating system should be covered with a self-leveling underlayment separating the flooring from the heat source by at least 1/2" (12mm).

-- Ceramic tile must be made smooth by applying a cementitious overlay such as patching or leveling compound.

-- All wood and wood composite panels, including plywood, OSB, flake board and particle board are acceptable subfloors as long as they are

dry, smooth, flat, structurally sound and free of deflection. Joints should

be sanded if they exhibit peaking, as this will telegraph to the surface of the new flooring.

-- Product can be installed over most existing hard-surface floor coverings provided the existing floor surface is smooth or can be made smooth. Existing floors must be solid. Fix any loose areas. Deeply embossed existing resilient floors require the use of an embossing leveler to avoid telegraphing to your new floor. Heavily cushioned vinyl flooring or vinyl flooring consisting of multiple layers are NOT suitable subfloors for installation.

-- Metal and Painted Floors: Remove any loose paint or ether finishes.

-- Existing adhesive residue must be removed or encapsulated. Never scrape adhesive residue that may contain asbestos.

Installation Requirements

This multi-fit loose lay product is for installing in the interior of any building with minimal adhesives, as long as the subfloor has been prepared to the standard as stated in SubfloorPreparation.

Tools Needed: Utility Knife, Carpenters Square or Straight Edge, Tape Measure. If using adhesive, follow adhesive supplier’s instructions.

Residential Installation Requirements:

  • a)Before installation, make sure the subfloor is dry and dustfree.
  • b)Flooring should be laid directly against walls, fixed with a bead of silicone after installation completed. Open transition areas with no wall to lay against should be fixed with 4” wideadhesive.
  • c)It is important for outer planks to fit snug against the wall or cabinets (fixed items), otherwise a 4” wide strip of tape or adhesive is required to hold the perimeter in place. It is best to fit tight against any baseboard or trim. If there is no baseboard and the sheetrock does not extend to the floor, then adhesive isrequired.
  • d)Make sure each tile/plank is fit tightly to the next piece. Very light tapping to get a tight fit is fine, but take care not to compress the plank you are tapping into. Firm and tight is correct, overly tight will lead to compression and later peaking joints when the compressed planks try to return to normal length or width.

Commercial Installation Requirements:

  • a)Follow steps a) through d)above.
  • b)High traffic areas, areas with large temperature variations,and areas with heavy rolling loads require full spread adhesive.

How to Install Planks and Tile

  • 1.Decide how you want the floor to run. Plank products usually look best when they run the length of the room. This is all a matter of preference, though, so feel free to lay some planks in different directions to see which way looksbetter.
  • 2.To avoid narrow plank widths or short plank lengths near the walls and doors, it is important to do some pre-planning. Using the width of the room, calculate how many full boards will fit into the area and how much space remains that will need to be covered by partial planks. Divide the remaining space by two to calculate the width of the partial planks. Do the same along thelength.
  • 3.The planks or tiles should be installed from one corner of the room working your way out toward the other wall. Planks or tiles should be laid tight against thewall.
  • 4.Using a utility knife and straight edge, score the top surface of the plank then use more pressure to cut all the way through.
  • 5.Start the next row. Planks should be installed randomly, making sure end joints are staggered and adjoining planks have end joints at least 6” (150mm) from the previous row’s end joint. Keep planks and tiles tight to the surroundingfloor.
  • 6.When fitting around door jambs or other irregular objects first make a pattern using heavy paper or poster board. Trace the pattern onto the flooring and cut with a utilityknife.
  • 7.If a seam is not tight you can easily lift the planks andreposition.

Cleaning and Maintenance

Prevent excessive dirt and moisture from being tracked on the floor with mats outside each entrance.

Use non-staining mats on your floor. Do not use rubber or latex backed mats which may permanently stain vinyl floors.

Routine cleaning is recommended to maintain the life of the floor. Use a neutral pH cleaner designed for vinyl floors.

Avoid exposure to direct sunlight for prolonged period. During peak sunlight hours, the use of blinds or curtains is recommended. Prolonged direct sunlight can result in discoloration and volatile temperature variations causing damage to the floor.

Any use of solvent material is prohibited and will not be warrantied.

  • Happy
  • Feet
  • International
  • Flooring
  • LVP
  • LVT
  • Quick
  • Fit
  • Marathon
  • Glue
  • Down
  • Click
  • Lock
  • Luxury
  • Vinyl
  • Plank
  • Tile
  • Wood
  • Look
  • Stover's
  • Liquidation

It's Time to Do It Right

It’s Time To Do It RightGenerally I side with installers when there are issues. But lately, the rash of calls I have been receiving on installers not taking the time to do things correctly, I have to re-think my stance. There is nothing more frustrating than when your asked to provide training and you show the installers the correct way [...]

Read More »

Dealing With Old Adhesive Residue

Installation Expertise with Tim McAdooJ.J. Haines & Co., Inc.Dealing With Old Adhesive ResidueAfter removing the existing flooring, sometimes dealing with the existing adhesive residue that has been left behind can be quite a task and many questions need answered.What type of adhesive is it?Is my new adhesive compatible with the existing adhesive?Does it contain *asbestos? How [...]

Read More »

Benefits of Bostik TruColor Tile Grout

Bostik TruColor Urethane GroutBostik TruColor Premium, Pre-Mixed, Urethane Grout is a patented, water-based, grout offering the ultimate in color accuracy, water resistance, and stain and crack protection. This breakthrough formulation installs up to 50% faster than traditional grouts, and never needs to be sealed. Its perfect balance of flexibility and toughness enables it to exhibit unmatched performance. Unlike other grouts that contain [...]

Read More »

Benefits of Bostik Dimensions Tile Grout

Bostik Dimension Urethane GroutDimension RapidCure Glass-Filled, Pre-Mixed, Urethane Grout is a patented, reflective, water based, urethane grout. Dimension RapidCure contains micro-glass beads and a translucent, urethane binder that both reflect light as well as allow it to pass through. This creates a variety of aesthetic effects in virtually all tile options available today. It may [...]

Read More »

Quarterly Installation Newsletter

Flooring Marketing – Be leery of flooring products that are promoting and showing their flooring products installed over poor subfloor conditions as shown below. In my travels, I see many flooring displays showing that their flooring can be installed over subfloors in absolute poor condition or existing floors also in poor condition.But, when you dig [...]

Read More »

State of the Industry

State of the IndustryIn the flooring world we are in a trend of easy to install flooring products, floating, locking, self- sticking. This has made us more of a DIY flooring industry. Products today are easier to install than they were 20 years ago. Products have been dummied up, taking more and more ability away [...]

Read More »

What is FloorScore Certified?

What is FloorScore Certified FloorScore is a voluntary, independent certification program that tests and certifies hard surface flooring and the materials they’re made with to ensure they are in compliance [...]

Read More »

Resilient Flooring and Dealing with Gypsum Underlayments

Resilient Flooring and Dealing with Gypsum Underlayments Gypsum underlayments are becoming more and more popular with contractors and are presenting more and more problems in the flooring industry. Gypsum Floor Underlayments are non-structural, poured gypsum floor underlayments that supply fire resistance and sound control while providing a durable, flat surface for finished floor coverings that are light in weight, inexpensive [...]

Read More »

Glue Down LVT and LVP Issues

Glue Down LVT and LVP Issues Luxury Vinyl Tile and Plank as a category continues to grow. Along with growth come issues. Today’s article reflects what I see in the field and what I feel are some of the problems associated with glue down LVT and LVP Flooring. Lack of acclimation – Vinyl Composition Tile is composed mostly of [...]

Read More »